I. Evaluation of Candidate Control Measures
A. Final Reports
1. Identification
and Evaluation of Candidate Control Measures, I (April 2005)
2. Identification
and Evaluation of Candidate Control Measures, II (June 2006)
3. Final Report::
Evaluation of Candidate Mobile Source Control Measures (February 2006)
4. Final Report: Evaluation
of Candidate Mobile Source Control Measures for LADCO States in 2009
and 2012 (March 2007)
5. Final Report:
Development of Technical Information for a Regional Fuels Strategy
(February 2006)
6. Benefit
Study of MRPO Candidate Control Options for Electricity Generation
(August 2006)
B. White Papers
(list of white papers)
1. EGUs
2. ICI
Boliers
3. Portland
Cement Plants
4. Industrial
Surface Coating
5. Degreasing
6. AIM
Coatings
7. Portable
Fuel Containers
8. Auto
Refinishing
9. Consumer
Solvents
10. Gasoline
Dispensing Facilities (Stage I and Stage II)
11. Asphalt
Applications
12. Petroleum
Refineries
13. Asphalt
Plants
14. Glass/Fiberglass
Manufacturing Plants
15. Chemical
Plants
16. Airport
Operations
C. Comments on White Papers
1. EGUS
a. Ohio
Electric Utilities
b. United
Mine Workers of America
c. American
Electric Power
d. Cinergy
e. CEED (BBC
Summary or BBC
Final Report)
f. MOG
i. Comparison
of EGU1 and EGU2 to Consent Decrees and BACT Limits
ii. Evaluation
of the Midwest RPO Interim Measures and EGU1 and EGU2
g. Midwest
Generation
h. City
of Springfield
i. Stratus
Consulting (LADCO contractor)
j. MOG/CEED
k. MOG
2. ICI Boilers
a. Ball
State University, Citizens Thermal Energy, CIBO, Peru Utilities
and Purdue University
3. Portland Cement Plants
a. Portland Cement Association (PCA)
i. October
2005
ii. May
2006
4. Industrial Surface Coating
a. National Paint & Coatings Association
i.
August 2005
5. AIM Coatings
a. National Paint & Coatings Association
i. August
2005
ii. November
2005
6. Consumer Solvents
a. CTFA
b. ASPA
c. CSPA
7. Asphalt Plants
a. National Asphalt Paving
Association (NAPA)
8. Other
a. Response
to Comments Document (MACTEC)
b.
American Petroleum Institute
D. Control Strategy Modeling
1. Round
1 Report
2.
Round 2 Report
3. Round 3 Report
a. Modeling
b. Emissions
4. Round 4 Report
a. Emissions
b. Modeling
(general)
c. Modeling
(4km)
E. BART
1. Final
Report
2. Industrial
Boilers
3. Petroluem
Refineries
4. Iron
and Steel Mills
5. Cement
Plants
F. IPM Emission Summaries
1. Base
Case—State-Level Summary
2.CAIR
Case—State-Level Summary
3. NEEDS
Data File
4. Parsed (Unit-Level) Data
a. 2009
b. 2012
c. 2015
d. 2018
5. EGU
1 and EGU 2 Report
II. Workshops